STS-125, the upgrade mission to Hubble, is presently scheduled to launch on May 12, 2009.
STS-127, the mission to deliver the Kibo Japanese Experimental Logistics Module to the ISS, is presently scheduled to launch May 15, 2009.
Can NASA launch 2 shuttles within 3 days of each other?
Can they manage 2 shuttles in orbit at the same time?
I expect one of these dates might change, but then maybe they can do it.
That would be great to follow both missions at the same time.
STS-125 and STS-127
- neufer
- Vacationer at Tralfamadore
- Posts: 18805
- Joined: Mon Jan 21, 2008 1:57 pm
- Location: Alexandria, Virginia
Re: STS-125 and STS-127
http://en.wikipedia.org/wiki/STS-127 wrote:
<<STS-127 is a Space Shuttle mission to the International Space Station (ISS) which will launch no earlier than May 15, 2009, a launch date dependent on whether STS-125 is given the go-ahead for a May 12 launch. If it is, NASA will reschedule STS-127 for June 13, 2009. It is expected to use Space Shuttle Endeavour. Its primary purpose is to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility (JEM EF) and the Exposed Section of the Experiment Logistics Module (ELM-ES). This will be ISS assembly flight "2J/A". After STS-127, Endeavour is scheduled to fly next on STS-130.>>
Art Neuendorffer
-
- Asternaut
- Posts: 8
- Joined: Fri Feb 27, 2009 6:10 am
Re: STS-125 and STS-127
Thanks for the answer, neufer. Good stuff that wikipedia! I would have never thought to look for the answer there, but it keeps amazing all the time what you can find there.